All Testimonials

Sorem Ipsum is simply dummy text of the rinting and typesetting industry aeorem Ipsum has been the industry standard dummy text ever sincer they Nullam

Mr. N.B. Deshmukh

Mr. N.B. Deshmukh

President JERP Procurement and Business Integration

“We are highly pleased with the Engineering and Operational capabilities of FWPL during JERP 2 Contract where they handled SODC's including C3 Splitter measuring 96.7m x 14.25m x 15.0m and weighing 1590MT. Their responsibilities included discharge of the SODC's from RO-RO Vessels using their SPMT's and their transport up to the Refinery site. FWPL completed the discharge operations within the given free time, without any detentions and demurrage, even when multiple vessels were calling simultaneously at Sikka.”

Mr. K.M.P. Jairaj

Mr. K.M.P. Jairaj

Chief Manager (C&P)

"Freight Wings safely and successfully completed the turnkey project of receiving 3 nos. HCU Reactors weighing 452MT each and 1 Separator weighing 160MT on Barges, their Marine Transportation, Land Transportation, and Erection. The entire work was carried out under the supervision of the PMC - Engineers India Limited.”

Mr. Sanjeev Kumar

Mr. Sanjeev Kumar

AGM (Purchase)

“Freight Wings have provided satisfactory Turnkey Services for Lifting, Shifting, and Placement of Generator Stators weighing up to 292MT at our Power plants in Chhattisgarh and Madhya Pradesh of various capacities including 500MW and 600MW by Strand Jack method.”

Mr. Arvind Sharma

Mr. Arvind Sharma

Manager TG (Team)

“The job of removal & replacement of 210 MW Generator Stator measuring 6.64m x 4.47m x 4.32m and weighing 180MT was executed safely by M/s Freight Wings Pvt. Ltd. using their 2x 300MT capacity strand jack lifting system, taking into consideration all Safety and Quality measures for the Heavy lift.”

Mr. Biswadeep Das

Mr. Biswadeep Das

Project Manager (PLQP Project)

“M/s Freight Wings Pvt Ltd successfully executed critical activity of Loadout of Offshore structures including a 3200 MT jacket at MFF Kattupalli (Chennai) yard using their SPMT's for our PLQP Project at DDW East. They were also responsible for complete Engineering and execution of the said loadout including mooring of the Barges and its Ballast, Deballast during the load out.”

Mr. Mahesh Khubchandani

Mr. Mahesh Khubchandani

JGM – Contracts

“We are pleased to appreciate FWPL's excellent and dedicated workmanship during the safe erection of 2x 600MW Generator Stators weighing 310MT each using their 500MT strand jacking lift system at our Salaya power plant in Jamnagar.”