“We are highly pleased with the Engineering and Operational capabilities of FWPL during JERP 2 Contract where they handled SODC’s including C3 Splitter measuring 96.7m x 14.25m x 15.0m and weighing 1590MT. Their responsibilities included discharge of the SODC’s from RO-RO Vessels using their SPMT’s and their transport up to the Refinery site. FWPL completed the discharge operations within the given free time, without any detentions and demurrage, even when multiple vessels were calling simultaneously at Sikka.”