Nature of Work : Transportation and Lifting of Pier Segments weighing 150MT each on Hydraulic Trailers and installing them at the foundation using our 4 point lifting system.
Project Highlight : Due to the access of the first two pier segments, the client was looking at using a super heavy crane for the placement of the segments. Giving them a factory to foundation solution, we transported the pier segments from their casting yard to the bridge approach and then installed the same using our 4 point Lift System.