Nature of work: Lifting and installing 500MW Boiler Drums weighing 238MT at the height of 78.6m at Marwa, Chhattisgarh.
Project Highlight: Lifting boiler drum weighing 238 MT to a height of 78.6m using our 2 x 180T Strand jacks.